May 17, 2024 9:47 a.m.

Malaysia’s PrefChem shut cracker, trimmed run rates at downstream units

Market sources with knowledge of the matter said the 1.2 million tons/year cracker is likely to restart within a week as the cause of the shutdown is not critical.

Title

Available in